Tel: 061 261 57 67
Warenkorb
Ihr Warenkorb ist leer.
Gesamt
0,00 CHF
  • Start
  • Bücher
  • Reports on the Present Condition of the Canada Consolidated Gold Mining Company's Property and on the Treatment of Its Ores at Deloro, Ontario (Classic Reprint)

Reports on the Present Condition of the Canada Consolidated Gold Mining Company's Property and on the Treatment of Its Ores at Deloro, Ontario (Classic Reprint)

Angebote / Angebote:

Excerpt from Reports on the Present Condition of the Canada Consolidated Gold Mining Company's Property and on the Treatment of Its Ores at Deloro, OntarioThe mines are in a position to produce 100 tons a day. The double engines and boilers for permanent hoisting-works - to hoist from two shafts from a central point - are on the ground (the boilers being included in the chattels sold), and the friction-drums are being made in Pennsylvania.The tram-road, with its iron cars for taking the ore from the mines to the mill, is in good order.The concentrating mill has a proved capacity of fully 100 tons in 20 hours, crushed to a maximum size of 15 mm. As much as 7 tons an hour have been put through.About the PublisherForgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.comThis book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 5 Arbeitstagen

Preis

12,90 CHF