Tel: 061 261 57 67
Warenkorb
Ihr Warenkorb ist leer.
Gesamt
0,00 CHF
  • Start
  • Bücher
  • Report on the Coquitlam-Buntzen Hydro-Electric Development, British Columbia, Vol. 8

Report on the Coquitlam-Buntzen Hydro-Electric Development, British Columbia, Vol. 8

Angebote / Angebote:

Excerpt from Report on the Coquitlam-Buntzen Hydro-Electric Development, British Columbia, Vol. 8: Annual Report, 1913-14The. Winter snows over the watershed are heavy and remain in the higher parts of the mountains until late in summer. The maximum rate of precipitation recorded occurred on November 27, 1-909, when 8-25 inches of rain fell in twenty-four hours. The maximum fall in ten minutes being 0-1 inches, and in one hour 056 inches.About the PublisherForgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.comThis book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully, any imperfections that remain are intentionally left to preserve the state of such historical works.
Folgt in ca. 10 Arbeitstagen

Preis

40,50 CHF