Rekonstruktion einer Ausstellung zur Projektkunst im öffentlichen Raum - integral(e) Kunstprojekte (1993)
BücherAngebote / Angebote:
Exhibition research focuses on the history of the realization and presentation of works of art. There is an investigation of the context, motivation, and manner in which these works arise as well as who participated in their creation and above all in their public display. In these object studies with regard to the visual arts, consideration is given to the respective presentational contexts in their particular spatial, temporal, and conceptional frameworks, included as well are aspects of materiality and functionality in both an ideal and a practical sense.
In art around 1990, an entire series of work forms indicates the existence of a broad spectrum of strategic shifts into other professional roles that are taken up on a fictional level by artists who engage in activity profiles derived from science, the economy, marketing, the service sector, or culture and education. Reflections concerning the meaning of authorship alter the concept of the artist, role-changes into other professional fields are undertaken. This is accompanied by a fictionalization of the artistic work. Emerging into view was an artistic procedure in which the compositional characteristics of the particular work served to define the specific sphere of activity within social structures and thereby to delineate the context, site, and circle of addressees for the presentation of the respective work. In 1993 in the exhibition integral(e) Kunstprojekte, it was possible to summarize various artistic positions which, on the basis of their approach, were realized in an ephemeral manner at different institutional sites in the urban space of Berlin.
In a research seminar at the Institute for Art History at the Friedrich-Alexander-Universität Erlangen-Nürnberg, a team of students reconstructed the artistic works that were realized in Berlin in 1993, thereby making it possible to present the documentary conclusions in a publication.
Folgt in ca. 2-3 Arbeitstagen