Tel: 061 261 57 67
Warenkorb
Ihr Warenkorb ist leer.
Gesamt
0,00 CHF

Apartheid’s Leviathan

Angebote / Angebote:

Beginning in the 1960s, electricity shortages have hampered South Africa's economic growth and negatively inflected the rise of its postapartheid democracy. Construction delays and escalating costs have thwarted the nation's mining, manufacturing, and power generation. This study thus demonstrates how technology has shaped South African history.
Folgt in ca. 10 Arbeitstagen

Preis

47,90 CHF